会议论文详细信息
CITIES 2017: Multi Perspectives on Peri-Urban Dynamics Towards Sustainable Development
Time and cost analysis of jacket structure load out using skidding
地球科学;经济学
Silvianita^1,2 ; Pradana, R.D.^1,2 ; Chamelia, D.M.^1,2 ; Dhanistha, W.L.^1,2
Department of Ocean Engineering, Faculty of Marine Technology, Indonesia^1
Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia^2
关键词: Cost analysis;    Jacket structures;    Load outs;    Low costs;    Project;    Project schedules;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/202/1/012024/pdf
DOI  :  10.1088/1755-1315/202/1/012024
来源: IOP
PDF
【 摘 要 】

This paper conducted an analysis to determine time and cost required in the jacket structure loadout process using skidding method. Determining normal time and cost in accordance to the company's budget for jacket structure loadout process using skidding with CPM. The purpose of this paper is to obtain project schedule with low cost using skidding with CPM to determine the time and cost needed for the jacket load out. The analysis result of time and cost by CPM for jacket structure loadout process using skidding is 9 days with a total cost US$ 68,196.

【 预 览 】
附件列表
Files Size Format View
Time and cost analysis of jacket structure load out using skidding 327KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:36次