会议论文详细信息
International Conference on Innovations and Prospects of Development of Mining Machinery and Electrical Engineering 2018
Posteriori analysis of technical resource of complex electrotechnical systems
矿业工程;电工学
Malozyomov, B.V.^1 ; Korovin, I.O.^2
Novosibirsk State Technical University, 20, Karla Marksa Av., Novosibirsk
630073, Russia^1
Federal State Budget Educational Institution of Higher Education Industrial, University of Tyumen, 38, volodarskogo Street, Tyumen
625000, Russia^2
关键词: Electrotechnical systems;    Posteriori analysis;    Preventive measures;    Technical resources;    Wear and tear;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/194/5/052014/pdf
DOI  :  10.1088/1755-1315/194/5/052014
来源: IOP
PDF
【 摘 要 】

In this paper, we consider a probabilistic mathematical model for estimating the state of the traction motor of a trolleybus. The operation of electric motors in transport is inevitably associated with a gradual wear and tear and the need for periodic repairs. For the effective construction of systems of preventive measures, control, testing, current and major repairs, the importance of the causes of the failure of electric motors is necessary.

【 预 览 】
附件列表
Files Size Format View
Posteriori analysis of technical resource of complex electrotechnical systems 720KB PDF download
  文献评价指标  
  下载次数:3次 浏览次数:7次