会议论文详细信息
2018 International Conference on Civil and Hydraulic Engineering
Analysis on Passenger Flow Changes during Holidays—A Case Study of Beijing-Shanghai High-Speed Railway
土木建筑工程;水利工程
Han, P.W.^1 ; Nie, L.^1,2
School of Traffic and Transportation, Beijing Jiaotong University, No.3 Shangyuancun, Haidian District, Beijing, China^1
Department of Transportation Management Engineering, School of Traffic and Transportation, Beijing Jiaotong University, Beijing
100044, China^2
关键词: Hierarchical clustering methods;    High;    speed railways;    High speed train (HST);    Line plans;    OD pairs;    Passenger flows;    Service frequency;    Short term;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/189/6/062051/pdf
DOI  :  10.1088/1755-1315/189/6/062051
学科分类:土木及结构工程学
来源: IOP
PDF
【 摘 要 】

In China, the number of passengers taking the high-speed train will increase dramatically during the short-term holidays. However, only a few researchers have analysed the characteristics of high-speed railway passenger flow change during the holidays and all of them just focused on the total number change, lacking analysis on different OD types. Therefore, in order to provide specific advice for making and optimizing the holiday high-speed train line plan, this paper studied passenger flow change during holidays based on OD classification, taking Beijing-Shanghai High-Speed Railway (BSHR) as an example. Firstly, we classified OD pairs into different groups according to OD level and OD distance, while the OD level is defined by the station level which was obtained by Hierarchical Clustering Method. Secondly, by counting and calculating the increased number of passengers during each holiday for each OD group, we drew the conclusion that the increased passenger flow of BSHR in holidays is mainly from the 2nd level OD, 1st level OD and [0, 500)km OD. Due to this result, we suggest to increase the service frequency of 1st and 2nd level OD pairs in holidays. Also, we prefer to add short-distance trains and try to avoid adding too many long-distance trains.

【 预 览 】
附件列表
Files Size Format View
Analysis on Passenger Flow Changes during Holidays—A Case Study of Beijing-Shanghai High-Speed Railway 1105KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:16次