2018 International Conference of Green Buildings and Environmental Management | |
Study on the storm-sediment yield model of the Baizhang Creek small watershed | |
土木建筑工程;生态环境科学 | |
Zhang, Jinjuan^1,2 ; Li, Gang^3 ; Shi, Xin^3 ; Zhang, Yousong^3 | |
Zhejiang Institute of Hydraulics and Estuary, Hangzhou | |
310020, China^1 | |
Zhejiang Provincial Key Laboratory of Hydraulics Disaster Prevention and Mitigation, Hangzhou | |
310020, China^2 | |
Department of Environmental Engineering, Zhejiang Guangchuan Engineering Consulting Co., Ltd., Hangzhou | |
310020, China^3 | |
关键词: Comprehensive managements; Flood peak discharge; Prevention and controls; Rainfall intensity; Simple structures; Statistical modeling; Statistical prediction model; Zhejiang Province; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/186/6/012029/pdf DOI : 10.1088/1755-1315/186/6/012029 |
|
来源: IOP | |
【 摘 要 】
Mastering the sediment yield in the watershed was the basis for the comprehensive management planning of the basin, the prevention and control of soil erosion, the rational utilization of the water resources. Due to the simple structure of the statistical model and the convenient calculation, the statistical prediction model of sediment yield was a powerful tool for the prediction of sediment yield. Based on the measured data of the Baizhang Creek small watershed in Zhejiang province, the impact factors of sediment were systematically analyzed. And then the main factors were considered to be rainfall, runoff depth, flood peak discharge and mean rainfall intensity, which were used to established statistical model of sediment yield in rainstorm. The statistical prediction model had a certain precision.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Study on the storm-sediment yield model of the Baizhang Creek small watershed | 264KB | download |