会议论文详细信息
| 2017 3rd International Conference on Environmental Science and Material Application | |
| Research on the raw data processing method of the hydropower construction project | |
| 生态环境科学;材料科学 | |
| Tian, Zhichao^1 | |
| Power China Chengdu Engineering Corporation Limited, Chengdu, Sichuan | |
| 610072, China^1 | |
| 关键词: Data processing methods; Hydropower construction projects; Statistics analysis; | |
| Others : https://iopscience.iop.org/article/10.1088/1755-1315/108/5/052095/pdf DOI : 10.1088/1755-1315/108/5/052095 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
In this paper, based on the characteristics of the fixed data, this paper compares the various mathematical statistics analysis methods and chooses the improved Grabs criterion to analyze the data, and through the analysis of the data processing, the data processing method is not suitable. It is proved that this method can be applied to the processing of fixed raw data. This paper provides a reference for reasonably determining the effective quota analysis data.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Research on the raw data processing method of the hydropower construction project | 136KB |
PDF