4th International Seminar on Sustainable Urban Development | |
Management of Hazardous Waste in Indonesia | |
地球科学;经济学 | |
Widyatmoko, H.^1 | |
Environmental Engineering Department, Faculty of Landscape Architecture and Environmental Technology, Universitas Trisakti, Jakarta, Indonesia^1 | |
关键词: Geological structures; Groundwater contamination; Hazardous waste treatment; Hazardous wastes; Leachate collection systems; Payback periods; treatment centrals; Vertical displacements; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/106/1/012032/pdf DOI : 10.1088/1755-1315/106/1/012032 |
|
来源: IOP | |
【 摘 要 】
Indonesia needs to build four Treatment Centrals for 229,907 tons per year produced hazardous waste. But almost all hazardous waste treatment is managed by just one company at present, namely PT. PPLI (Prasada Pamunah Limbah Industri). This research is based on collected data which identifies payback period of 0.69 years and rate of return 85 %. PT PPLI is located within the Cileungsi District of the Bogor Regency of West Java Province. Records from nearest rainfall station at Cibinong indicate that annual average rainfall for the site is about 3,600 mm. It is situated on hilly terrain and is characterized by steep slopes as well as has a very complex geological structure. The Tertiary sequence was folded to form an assymetric anticline with axis trend in an East-West direction. Three major faults cut the middle of the site in a North-South direction with a vertical displacement of about 1.5 meters and a zone width of 1 meter. The high concentration of Chemical Oxygen Demand (COD) 2500 ppm in Secondary Leachate Collection System (SLCS) indicate a possible failure of the Primary Leachate Clection System (PLCS), which need correct action to prevent groundwater contamination.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Management of Hazardous Waste in Indonesia | 586KB | download |