| 2017 International Conference on New Energy and Future Energy System | |
| Construction technology of high-rise pile cap foundation of offshore wind power in Taiwan Strait | |
| Li, C.Y.^1 ; Chi, Y.^1 ; Sun, X.Q.^1 ; Han, Y.P.^1 ; Chen, X.^2 ; Zhao, L.C.^2 ; Zhang, H.^2 | |
| Institute of Offshore Engineering Technology, Zhongneng Power-Tech Development Company Limited, Beijing | |
| 100034, China^1 | |
| Department of Offshore Wind Power Project, Fujian Longyuan Wind Power Company Limited, Fujian | |
| 350103, China^2 | |
| 关键词: Bearing platform; Construction period; Construction technologies; Foundation construction; High-rise pile cap; Off-shore wind power; Structural characteristics; Traditional constructions; | |
| Others : https://iopscience.iop.org/article/10.1088/1755-1315/93/1/012037/pdf DOI : 10.1088/1755-1315/93/1/012037 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
Offshore wind farms promise to become an important source of energy in the near future. The high-rise pile cap foundation is one of the typical foundation types for offshore wind turbine. This paper introduces the structural characteristics and construction technology of high-rise pile cap foundation, aiming at the characteristics of the sea area of Taiwan Strait and combining with engineering examples. The construction technology of high-rise pile cap foundation is expounded emphatically from the manufacture and transportation of steel pipe piles, pile foundation construction and bearing platform construction. Compared with the traditional construction technology, the construction technologies used in this project are safer and more reliable. The construction period of piles cap foundation is shortened by 10 ∼ 48 days. The construction technology provides reference for offshore wind power foundation construction.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Construction technology of high-rise pile cap foundation of offshore wind power in Taiwan Strait | 845KB |
PDF