会议论文详细信息
2017 International Conference on New Energy and Future Energy System
Construction technology of high-rise pile cap foundation of offshore wind power in Taiwan Strait
Li, C.Y.^1 ; Chi, Y.^1 ; Sun, X.Q.^1 ; Han, Y.P.^1 ; Chen, X.^2 ; Zhao, L.C.^2 ; Zhang, H.^2
Institute of Offshore Engineering Technology, Zhongneng Power-Tech Development Company Limited, Beijing
100034, China^1
Department of Offshore Wind Power Project, Fujian Longyuan Wind Power Company Limited, Fujian
350103, China^2
关键词: Bearing platform;    Construction period;    Construction technologies;    Foundation construction;    High-rise pile cap;    Off-shore wind power;    Structural characteristics;    Traditional constructions;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/93/1/012037/pdf
DOI  :  10.1088/1755-1315/93/1/012037
来源: IOP
PDF
【 摘 要 】

Offshore wind farms promise to become an important source of energy in the near future. The high-rise pile cap foundation is one of the typical foundation types for offshore wind turbine. This paper introduces the structural characteristics and construction technology of high-rise pile cap foundation, aiming at the characteristics of the sea area of Taiwan Strait and combining with engineering examples. The construction technology of high-rise pile cap foundation is expounded emphatically from the manufacture and transportation of steel pipe piles, pile foundation construction and bearing platform construction. Compared with the traditional construction technology, the construction technologies used in this project are safer and more reliable. The construction period of piles cap foundation is shortened by 10 ∼ 48 days. The construction technology provides reference for offshore wind power foundation construction.

【 预 览 】
附件列表
Files Size Format View
Construction technology of high-rise pile cap foundation of offshore wind power in Taiwan Strait 845KB PDF download
  文献评价指标  
  下载次数:18次 浏览次数:24次