| Energy Management of Municipal Transportation Facilities and Transport - EMMFT 2017 | |
| Complex evaluation of the loft-style of retrivation as a type of building conversion | |
| Chulkov, V.^1 ; Kazaryan, R.^1 ; Kuzina, O.^1 ; Maloyan, G.^1 ; Efimenko, A.^1 | |
| Moscow State University of Civil Engineering, Yaroslavskoye Sh. 26, Moscow | |
| 129337, Russia^1 | |
| 关键词: Assembly-disassembly; Building reconstruction; Building systems; Complex evaluations; Integral evaluation; Multiparameters; Normal operations; Transport industry; | |
| Others : https://iopscience.iop.org/article/10.1088/1755-1315/90/1/012149/pdf DOI : 10.1088/1755-1315/90/1/012149 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
Construction reorganization is part of a basic reorganization cycle in which four phases (phases, states, technological redistribution) are consistently implemented: device, disorganization, reorganization and co-organization. The field of our research lies in the phase of reconstruction. One of the varieties of building reconstruction is retrieval (from English retrieve - to restore, find) - bringing the reorganized object into a working state by attaching to the old functional building system of the new system. Retraining provides the ability to replace elements of the new system locally or in general (implementing the principle of "assembly-disassembly") and provides for the elimination of the moral deterioration of the building and the normal operation of the facility. In the construction and transport industry there is a sufficiently large number of multiparameter tasks that require a systematic approach and the definition of a single integrated indicator of the effectiveness of the operation. These tasks can be solved using a variety of approaches. One of such approaches, as the method of integral evaluation based on stellar infographic models, is considered.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Complex evaluation of the loft-style of retrivation as a type of building conversion | 292KB |
PDF