Energy Management of Municipal Transportation Facilities and Transport - EMMFT 2017 | |
Integrated technique of planning the capital repair of residential buildings and objects of transport infrastructure | |
Dement'Eva, Marina^1 | |
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow | |
129337, Russia^1 | |
关键词: Comparative analysis; Economic criteria; Engineering systems; Integrated techniques; Residential building; Residential development; Transport infrastructure; Wear mechanisms; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/90/1/012052/pdf DOI : 10.1088/1755-1315/90/1/012052 |
|
来源: IOP | |
【 摘 要 】
The paper presents the results of a comparative analysis of two fundamentally different methods for planning capital repairs of objects of transport infrastructure and residential development. The first method was based on perspective long-term plans. Normative service life were the basis for planning the periodicity of repairs. The second method was based on the performance of repairs in fact of the onset of the malfunction. Problems of financing repair work, of the uneven aging of constructs and engineering systems, different wear mechanism in different conditions of exploitation, absence of methods of planning repairs of administrative and production buildings (depots, stations, etc.) justify the need to optimize methods of planning the repair and the relevance of this paper. The aim of the study was to develop the main provisions of an integrated technique for planning the capital repair of buildings of any functional purpose, which combines the advantages of each of the discussed planning methods. For this purpose, the consequences of technical and economic risk were analyzed of the buildings, including stations, depots, transport transfer hubs, administrative buildings, etc when choosing different planning methods. One of the significant results of the study is the possibility of justifying the optimal period of capital repairs on the basis of the proposed technical and economic criteria. The adjustment of the planned repair schedule is carried out taking into account the reliability and cost-effectiveness of the exploitation process.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Integrated technique of planning the capital repair of residential buildings and objects of transport infrastructure | 542KB | download |