会议论文详细信息
Energy Management of Municipal Transportation Facilities and Transport - EMMFT 2017
Combination method of the intrasite preliminary works with the works of main period
Oleynik, Pavel^1
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow
129337, Russia^1
关键词: Capacity increase;    Combination method;    Construction machinery;    Construction period;    Construction works;    Development method;    Facility designs;    Utility systems;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/90/1/012031/pdf
DOI  :  10.1088/1755-1315/90/1/012031
来源: IOP
PDF
【 摘 要 】

The intrasite works volume to be executed prior to the main construction and installation works is specified herein. The part of these works - utility systems installation in combined earth cuts and plots development out of the installation zones of civil engineering - is proposed to be executed in combining with the main period construction works. In this regard there is the solutions development method, containing the determination of structure and volume of the intrasite preliminary works being executed prior to the main construction period and in combining with this period. The dependence of specified parameters from the territory built-up density is shown herein. The obtained calculated indices of works volume may be used for the facility design and works execution, and may serve as a basis for the relevant regulations development (the fragment of such regulations is given in this Article). The specified method efficiency is characterized by the significant reduction of the earth works volume and construction machinery capacity increase.