会议论文详细信息
Innovations and Prospects of Development of Mining Machinery and Electrical Engineering
Increasing percentage of uptime of pipeline transport system at production association LLC KINEF
矿业工程;电工学
Maharatkin, P.N.^1 ; Yablokov, I.N.^1 ; Serzhan, S.L.^1
Saint-Petersburg Mining University, 2, 21st Line, St. Petersburg
199106, Russia^1
关键词: Health assessments;    Integrated reliabilities;    Long-term forecast;    Non destructive inspection;    Pipeline transport;    Preventive maintenance (pm);    Quantitative changes;    Technical conditions;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/87/2/022013/pdf
DOI  :  10.1088/1755-1315/87/2/022013
来源: IOP
PDF
【 摘 要 】

The system of the preventive maintenance (PM), accepted at production association LLC KINEF, taking into account safe operation and health assessment, is analyzed. Statistical data of results of diagnostics are processed; options of the increase of the integrated reliability indicator of the system of pipeline transport are offered. The trend lines of a condition change of the pipeline in time and the approximate curves of diagnostic data of nondestructive inspection technique with creation of the long-term forecast of its technical condition was constructed. The option of correction of the accepted PM system with the analysis of quantitative change of an indicator of reliability was developed, by which application of the percentage of uptime will increase from 0.909 to 0.957.

【 预 览 】
附件列表
Files Size Format View
Increasing percentage of uptime of pipeline transport system at production association LLC KINEF 393KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:13次