会议论文详细信息
Innovations and Prospects of Development of Mining Machinery and Electrical Engineering
Quality preparation improvement of mined rock for mining extraction considering spatial temporary formation of field strain
矿业工程;电工学
Dolzhikov, V.V.^1 ; Marinin, M.A.^1
Saint-Petersburg Mining University, 21 Line, 2, Saint-Petersburg
199106, Russia^1
关键词: End-products;    Explosion waves;    Interval delay;    Method of calculation;    Pilot tests;    Rock mass;    Wavefields;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/87/5/052003/pdf
DOI  :  10.1088/1755-1315/87/5/052003
来源: IOP
PDF
【 摘 要 】

The analysis of blasting works production shows the necessity of quality preparation improvement of rock mass for the subsequent processing. Blast operations make up 20% to 30% of the general and end products cost. The crushing of mined rock strongly depends on an action of an explosion wave direction. The investigation results of the wave field strain at explosion of the system of borehole charges have been presented in this paper. The model and method of calculation of the wave field strain have been provided. The influence of an interval delay between a borehole set and the ignition direction on wave tension has been established. Results of the pilot tests scheme of ignition for the pit of the construction materials "Prudyansky" located in Leningrad region of Russia have been demonstrated.

【 预 览 】
附件列表
Files Size Format View
Quality preparation improvement of mined rock for mining extraction considering spatial temporary formation of field strain 126KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:42次