28th IAHR symposium on Hydraulic Machinery and Systems | |
Hydraulic analysis and optimization design in Guri rehabilitation project | |
Cheng, H.^1,2 ; Zhou, L.J.^2 ; Gong, L.^1 ; Wang, Z.N.^1 ; Wen, Q.^1 ; Zhao, Y.Z.^1 ; Wang, Y.L.^1 | |
Dongfang Electrical Machinery Co., Ltd., No. 188 Huang He West Road, Deyang, Sichuan Province | |
618000, China^1 | |
College of Water Resources and Civil Engineering, China Agricultural University, Beijing | |
100083, China^2 | |
关键词: Application feasibility; Efficiency levels; Hydraulic analysis; Hydraulic performance; Optimization design; Optimization procedures; Rehabilitation projects; Simulation technique; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/49/10/102004/pdf DOI : 10.1088/1755-1315/49/10/102004 |
|
来源: IOP | |
【 摘 要 】
Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.