会议论文详细信息
20th International Scientific Symposium of Students, Postgraduates and Young Scientists on "Problems of Geology and Subsurface Development"
Vertical section construction of wells at Kuyumbinsky oil field via percussive-rotary drilling with DTH hammer.
Buzanov, K.V.^1 ; Nechaeva, L.N.^1 ; Ulyanova, O.S.^1
National Research Tomsk Polytechnic University, 30 Lenina Ave., Tomsk
634050, Russia^1
关键词: Bottom hole;    Dth hammers;    Engineering solutions;    Key factors;    Mud loss;    Resource-saving technologies;    Rotary drilling;    Vertical section;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/43/1/012072/pdf
DOI  :  10.1088/1755-1315/43/1/012072
来源: IOP
PDF
【 摘 要 】

The article presents the analysis of sequential use of mobile percussive-rotary drilling sets with DTH hammer and bottom-hole cleaning by foam mud in construction of vertical sections along with at Kuyumbinsky oil field. On the basis of the analysis, an engineering solution is proposed to prevent disastrous mud loss that is the key factor of efficiency in implementation of resource-saving technologies.

【 预 览 】
附件列表
Files Size Format View
Vertical section construction of wells at Kuyumbinsky oil field via percussive-rotary drilling with DTH hammer. 1336KB PDF download
  文献评价指标  
  下载次数:59次 浏览次数:49次