会议论文详细信息
Scientific and Technical Challenges in the Well Drilling Progress
Well extension in fractured and broken rocks by wire-line tool (SSK-59)
Brilin, V.I.^1 ; Ulyanova, O.S.^2
Department of Well Drilling, Institute of Natural Resources, National Research Tomsk Polytechnic University Tomsk, Russia^1
Department of Foreign Languages, Institute of Natural Resources, National Research Tomsk Polytechnic University Tomsk, Russia^2
关键词: Downhole pumps;    Drilling process;    Drilling rates;    Lateral vibrations;    Recovery ratio;    Rotation speed;    Sandstone formations;    Tool applications;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/24/1/012006/pdf
DOI  :  10.1088/1755-1315/24/1/012006
来源: IOP
PDF
【 摘 要 】

Conditions of increasing the drilling rate per run, which influence wire-line tool application efficiency, are analyzed. Decreasing of drilling rate is usually caused by alarm initiation which indicates core blocking. Producing of longitudinal and lateral vibrations during drilling process and initiation of fluid upward flow inside the inner core pipe, significantly increases the drilling rate. For initiating an upward flow inside the inner core pipe it is suggested to install the bottom hole pump inside the wireline inner core barrel to be applied as a mechanical motor of downhole vibrator which starts to operate only in a case of core blocking. It was found out that the bottom hole pump provided the necessary speed of upward flow (0.3 - 0.5 m/s) at the rotation speed of more than 150 rpm. Field test was carried out to drill siltstone and sandstone formations of 9 -10 drilling category and their alternation with the formation dip angle of more than 70° (rough and disintegrated rocks). The upward flow inside the inner core pipe SSK-59 allowed increasing the drilling rate by 10% as well as to increase core recovery ratio. Besides, it was noted that a large amount of the cuttings (sized 8 - 10 mm) were accumulating inside the inner core pipe during downhole pump application, that in its turn, proved the initiation of upward flow inside the inner core pipe.

【 预 览 】
附件列表
Files Size Format View
Well extension in fractured and broken rocks by wire-line tool (SSK-59) 812KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:23次