会议论文详细信息
2019 2nd International Conference of Green Buildings and Environmental Management | |
Study on reasonable gas recovery rate and adjustment scheme of bottom water gas reservoir | |
生态环境科学 | |
Zhi, Ji-Qiang^1 ; Liu, Yi-Kun^1 ; Bai, Ming-Xing^1^2 ; Jiang, Nan^3 ; Gao, Shuo^1 | |
School of Petroleum Engineering, Northeast Petroleum University, Daqing | |
163318, China^1 | |
School of Petroleum Engineering, Xi'An Shiyou University, Xi'an | |
710065, China^2 | |
School of Electrical Engineering and Information, Northeast Petroleum University, Daqing | |
163318, China^3 | |
关键词: Gas productions; Gas recovery; Gas reservoir; Production testing; Systematic analysis; Water control; Water intrusions; Water shut off; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/310/3/032003/pdf DOI : 10.1088/1755-1315/310/3/032003 |
|
学科分类:环境科学(综合) | |
来源: IOP | |
【 摘 要 】
During the exploitation of bottom water gas reservoirs, the gas wells have a serious impact on the development of gas reservoirs. Based on the systematic analysis of the production dynamics and water intrusion characteristics of the bottom water gas reservoir in the XS gas field, combined with seismic, geological, well logging, production testing and other data, a numerical simulation model was established to demonstrate the rational gas production rate after gas reservoir seeing water. Research on the mechanism of water control. The gas reservoir numerical simulation technology is used to determine the reasonable gas production speed of the gas well, which can alleviate the bottom water coning rate and prolong the waterless gas production period. Combined with measures such as drainage, water shutoff, and shut-in, the rational gas production rate and adjustment measures for the bottom water gas reservoir are formulated.【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Study on reasonable gas recovery rate and adjustment scheme of bottom water gas reservoir | 1172KB | download |