Finite Element Analysis of Ultra-deep Foundation Pit Covered Top-Down Excavation Based on PLAXIS | |
生态环境科学 | |
Zhang, Jianming^1 | |
China Railway Siyuan Survey and Design Group Co.Ltd, Wuhan, Hubei | |
430063, China^1 | |
关键词: Construction process; Diaphragm wall; Earth pressure; Finite element software; Foundation pits; Soil constitutive model; Surface settlements; Ultra deeps; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/300/2/022158/pdf DOI : 10.1088/1755-1315/300/2/022158 |
|
学科分类:环境科学(综合) | |
来源: IOP | |
【 摘 要 】
The construction process of Xujiapeng ultra-large and ultra-deep foundation pit was simulated by finite element software Plaxis with the use of HSS soil constitutive model. The surface settlement around the foundation pit was "concave" shape and the settlement value was about 30mm. The diaphragm wall had a maximum deformation of 32.29mm to the direction of the internal under the overload, load of building and water and earth pressure. The foundation pit produced a slight distortion under the action of uneven load. A slight distortion occurred under the action of uneven load in the foundation pit.