会议论文详细信息
IGEOS International Geography Seminar 2018
GNSS Processing Data Result with Sequential Adjustment Method to Estimate the Monitoring Control Point Coordinate at Sermo Dam
Affriani, A.R.^1 ; Widjajanti, N.^2 ; Yulaikhah^2
Department of Geography Education, Faculty of Social Sciences Education, Universitas Pendidikan Indonesia, Indonesia^1
Departement of Geodetic Engineering, Faculty of Engineering, Universitas Gadjah Mada, Indonesia^2
关键词: 3D coordinates;    Adjustment method;    Area monitoring;    Control point;    Ground cracks;    Monitoring control;    Precision analysis;    Processing strategies;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/286/1/012040/pdf
DOI  :  10.1088/1755-1315/286/1/012040
来源: IOP
PDF
【 摘 要 】

Monitoring a structure building like a dam needs to detect any movement. The movement can be measured by adding control point to measure it. Geodynamic movement, expansion of area monitoring, and detection of ground cracks require by adding the new of control points. The addition of control points in a measurement requires specific data processing strategy. Therefore, it used the sequential adjustment method. This research aims to identify 3D coordinate values and the difference precision of the control points from the sequential adjustment method. The first step of sequential adjustment used five control points with one point considered fixed. The second step was added with five control points. The difference of coordinate precision analysis using sequential adjustment method indicates that there are increased precision in five control points which are processed in the first step. The addition of the coordinate precision ranges from 0,193 to 5,450 cm. Based on the comparative of two variants sample test shows that the precision of coordinates resulted for the first step is significant different from the second step. The results of the comparison between two variants test indicate that the precision of the result in first step does significantly different to the second step.

【 预 览 】
附件列表
Files Size Format View
GNSS Processing Data Result with Sequential Adjustment Method to Estimate the Monitoring Control Point Coordinate at Sermo Dam 1188KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:16次