会议论文详细信息
| International Conference on Sustainable Energy and Green Technology 2018 | |
| Optimization study on laying and installation of conjugated directly-buried heating pipes | |
| 能源学;生态环境科学 | |
| Fu, Z.B.^1 ; C.F., Yang ; Y.F., Li ; M., Zhou ; J.F., Wang ; L.Y., Zhang | |
| School of Human Settlements and Civil Engineering, Xi'An Jiaotong University, Shaanxi | |
| 710049, China^1 | |
| China Northwest Architecture Design and Research Institute Co.Ltd, Shaanxi | |
| 710018, China^2 | |
| chn, Beijing | |
| 100176, Beijing^3 | |
| 关键词: Buried heating pipes; Construction costs; Insulation materials; Insulation thickness; Life cycle cost analysis; Objective functions; Optimal combination; Optimization studies; | |
| Others : https://iopscience.iop.org/article/10.1088/1755-1315/268/1/012097/pdf DOI : 10.1088/1755-1315/268/1/012097 |
|
| 学科分类:环境科学(综合) | |
| 来源: IOP | |
PDF
|
|
【 摘 要 】
The total cost of life cycle for district heating pipes can be significantly reduced by combinatorial optimization of laying and installation parameters. The objective function was established by Life Cycle Cost Analysis method and solved by Genetic Algorithm method of MATLAB in this study. The results show that the total cost, heat loss cost, construction cost and insulation material cost increase with the increases of pipe nominal diameter. The optimal combination of buried depth and insulation thickness were obtained for different pipe diameters.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Optimization study on laying and installation of conjugated directly-buried heating pipes | 679KB |
PDF