会议论文详细信息
| Challenges for Development in Mining Science and Mining Industry | |
| Cut-and-fill stoping by vertical blocks in Internatsionalny mine | |
| Neverov, A.A.^1 ; Neverov, S.A.^1 ; Nikolsky, A.M.^1 ; Tishkov, M.V.^2 ; Shchukin, S.A.^1 | |
| Chinakal Institute of Mining, Siberian Branch Russian, Academy of Sciences, Novosibirsk, Russia^1 | |
| Yakutniproalmaz Institute, Yakutia, Russia^2 | |
| 关键词: Cut and fill; Kimberlite pipes; | |
| Others : https://iopscience.iop.org/article/10.1088/1755-1315/262/1/012051/pdf DOI : 10.1088/1755-1315/262/1/012051 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
The paper describes design and geomechanical assessment of cut-and-fill system of stoping by vertical blocks under protection of artificial roof, with breakage and cemented backfill in the conditions of limited area of Internatsionalnaya kimberlite pipe. It has been found that safe stoping is ensured if the pillar between vertical blocks has the double width of a block.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Cut-and-fill stoping by vertical blocks in Internatsionalny mine | 596KB |
PDF