会议论文详细信息
29th IAHR Symposium on Hydraulic Machinery and Systems
Parameters design and simulation research of water pressure phase compensation link in governor side of hydro turbine generating unit
Zeng, Y.^1 ; Qian, J.^1 ; Yu, S.G.^2 ; Yang, G.B.^1 ; Zhang, Z.K.^1 ; Wang, F.F.^1 ; Zhang, J.K.^1
Faculty of Metallurgical and Energy Engineering, Kunming University of Science and Technology, Kunming
650093, China^1
Department of Engineering Mechanics, Kunming University of Science and Technology, Kunming
650500, China^2
关键词: Active power regulations;    Compensation control;    High water pressure;    Operation simulation;    Phase compensation;    Power System Stabilizer;    Simulation research;    Transient process;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/240/9/092009/pdf
DOI  :  10.1088/1755-1315/240/9/092009
来源: IOP
PDF
【 摘 要 】

Using the phase signal of water pressure oscillation in inlet of turbine as auxiliary signal of governor can restrain the water pressure oscillation of pipe. Refer to the structure of power system stabilizer, two structure types of leading phase compensation link are given in this paper, and its structure design and parameters assignment are analyzed. Based on the operation simulation system of the hydro turbine generating sets, simulation research is carried out from two aspects, (i) effect of two structure types phase compensation link on inhibitory effect of water pressure; (ii) effect of the amplitude gain of compensation branch on the compensation control. Research shows that the leading phase compensation link proposed can effectively reduce the water pressure oscillation for transient process with high water pressure fluctuation, but its effect on normal active power regulation is very little.

【 预 览 】
附件列表
Files Size Format View
Parameters design and simulation research of water pressure phase compensation link in governor side of hydro turbine generating unit 417KB PDF download
  文献评价指标  
  下载次数:28次 浏览次数:18次