会议论文详细信息
4th International Conference on Advances in Energy Resources and Environment Engineering
Analysis of Deep Ground Stress in -830m~-1030m Northwest Jiaodong of a Mine
能源学;生态环境科学
Li, Guilin^1 ; Wang, Jianbo^1 ; Zhao, Jie^1 ; Cheng, Li^1 ; Wang, Xi^1
Deep Well Mining Lab Branch, Shandong Gold Mining Technology Co. Ltd., Yantai
264000, China^1
关键词: Accurate measurement;    Deep mining;    Ground stress;    Insitu stress;    Mine reserves;    Operating environment;    Ore bodies;    Urgent problems;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/237/3/032127/pdf
DOI  :  10.1088/1755-1315/237/3/032127
学科分类:环境科学(综合)
来源: IOP
PDF
【 摘 要 】

At present, Northwest Jiaodong of a mine has entered the operating environment of-1030m, which is one of the few gold mines in China that have entered the kilo meter operation. The preliminary exploration shows that the mine reserves are abundant and the grade is ideal at about-1500m. However, with the continuous deepening of the ore-body to the deep, the underground pressure is increasing, and the mining difficulty is also increasing, which brings a lot of difficulties to the deep mining. Many problems need to be studied urgently, and the measurement and calculation of ground stress becomes one of the urgent problems in deep mining. Through accurate measurement of in-situ stress, the design and exploitation of deep wells can be carried out scientifically, so as to avoid the harm caused by pressure enhancement.

【 预 览 】
附件列表
Files Size Format View
Analysis of Deep Ground Stress in -830m~-1030m Northwest Jiaodong of a Mine 507KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:14次