会议论文详细信息
2018 International Conference on Construction, Aviation and Environmental Engineering
The whole process cost management based on BIM
生态环境科学;生物科学
Zou Ting, Ji Xue^1 ; Guo, Xue Jia^1
No.8, dong yi road, chang 'an district, xi 'an city, shan xi province China Building 10-13, building no.58, south second ring, xi 'an city China 277 yan ta xi road, xi 'an city, shan xi province China, China^1
关键词: Construction preparations;    Construction projects;    Engineering constructions;    Feasibility studies;    Investment benefit;    Organizational activities;    Preliminary design;    Project construction;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/233/2/022020/pdf
DOI  :  10.1088/1755-1315/233/2/022020
来源: IOP
PDF
【 摘 要 】

The-whole-process cost management is the overall process of engineering construction from feasibility study through preliminary design, construction preparation, contracting, construction, completion and post-evaluation. All organizational activities and business behaviors centering on engineering cost can ensure the investment benefits of construction projects. this paper introduces how the cost management of BIM technology plays a role in the project construction.

【 预 览 】
附件列表
Files Size Format View
The whole process cost management based on BIM 300KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:22次