Power system scheduling model considering period-to-period ramp-capability constraints with renewable power uncertainty
能源学;生态环境科学
Tang, Chenghui^1 ; Qu, Haoyuan^1 ; Zhao, Zheng^1
State Grid Energy Research Institute CO., LTD., Beijing
102209, China^1
关键词: Conventional power plants;    Day-ahead;    Day-ahead scheduling;    IEEE 118-bus system;    Linear modeling;    Penalty cost;    Power system scheduling;    Renewable Power;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/227/2/022033/pdf
DOI  :  10.1088/1755-1315/227/2/022033
学科分类:环境科学(综合)
来源: IOP
PDF
【 摘 要 】
Power system scheduling with renewable power integration aims to determine the scheduled power of conventional power plants and renewable power plants. This paper proposes a day-ahead power system scheduling method considering period-to-period ramp-capability constraints with renewable power uncertainty. The renewable uncertainty cost is considered based on the overestimation and underestimation penalty cost and further converted to be a linear model. The period-to-period ramp-capability constraints with renewable power uncertainty are incorporated into the proposed day-ahead scheduling model, which ensures that any period-to-period power trajectory within upper and lower envelops are restricted by the ramping up and down limits. Finally, numerical studies in the IEEE 118-bus system are presented to demonstrate the merits of the proposed method.