会议论文详细信息
3rd International Conference on Energy Engineering and Environmental Protection
The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant
能源学;生态环境科学
Zhang, Zhenguo^1 ; Feng, Huixing^1
Suzhou Nuclear Power Research Institute Co., Ltd., Shenzhen, Guangdong
518124, China^1
关键词: Hydrostatic test;    Key equipment;    Technical difficulties;   
Others  :  https://iopscience.iop.org/article/10.1088/1755-1315/227/2/022014/pdf
DOI  :  10.1088/1755-1315/227/2/022014
学科分类:环境科学(综合)
来源: IOP
PDF
【 摘 要 】

Nuclear vessels hydrostatic test involves many important systems and key equipment in CPR1000 models nuclear power plant. This paper introduces how to make the nuclear vessel hydrostatic test scheme and the implementation of vessel hydrostatic test. The scheme of nuclear vessel hydrostatic test contains hydrostatic test plan scheduling, hydrostatic test Isolation Boundary, cutting and welding of hydrostatic test aspect, The implementation of nuclear vessel hydrostatic test contains instrument of hydrostatic test, working file of hydrostatic test, manpower arrangement of hydrostatic test, actual execution of hydrostatic test and technical difficulties of vessel hydrostatic test. This paper mainly discusses the scheme and implementation of nuclear vessel hydrostatic test.

【 预 览 】
附件列表
Files Size Format View
The scheme and implementation of vessel hydrostatic test in cpr1000 nuclear power plant 164KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:46次