2018 International Conference on Civil, Architecture and Disaster Prevention | |
Optimization analysis of external prestressing reinforcement scheme for concrete curved girder bridge | |
土木建筑工程 | |
Li, Hongbin^1 ; Zhang, Lianrui^2 ; Zhong, Tieyi^1 ; Wang, Jiawei^1 | |
School of Civil Engineering, Beijing Jiaotong University, Beijing | |
100044, China^1 | |
China Communications Three Public Works First Engineering Co. Ltd., Beijing | |
100044, China^2 | |
关键词: Analysis models; Curved girder bridges; External loads; External prestressing; External prestressing methods; Optimization analysis; Tension controls; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/218/1/012012/pdf DOI : 10.1088/1755-1315/218/1/012012 |
|
学科分类:土木及结构工程学 | |
来源: IOP | |
【 摘 要 】
In this paper, the external prestressing method is used to reinforce a prestressed concrete curved girder bridge. The calculation and analysis model of external prestressing reinforcement is established. The alignment of external prestressing tendons and the tension control stress are studied. The reasonable alignment of external prestressing tendons and the parameters of tension control stress are given. The results show that when two steering blocks are set at one-fourth span and three-quarters span to control the alignment and the prestress value outside the curved girder bridge is 25%-35% larger than that inside the bridge, not only the bearing capacity and stiffness requirements can be met, but also the torque produced by the main girder under the external load can be effectively reduced.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Optimization analysis of external prestressing reinforcement scheme for concrete curved girder bridge | 1424KB | download |