Annual Conference on Industrial and System Engineering 2019 | |
Implementation of PDCA Cycle in Calibration and Testing Laboratory Based on ISO/IEC 17025:2017 | |
工业技术(总论) | |
Habibie, M.H.^1 ; Kresiani, R.H.^1 | |
Pusat Riset Dan Pengembangan SDM, Badan Standardisasi Nasional, Kompleks Puspiptek, Tangerang Selatan, Indonesia^1 | |
关键词: ISO 9001; ISO/IEC 17025; PDCA cycles; Plan do check acts; Process-based; Reference standard; Testing laboratories; Transition period; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/598/1/012108/pdf DOI : 10.1088/1757-899X/598/1/012108 |
|
学科分类:工业工程学 | |
来源: IOP | |
【 摘 要 】
ISO/IEC 17025:2017 is aninternational reference standard for calibration and testing laboratories to improve their competence, to promote confidence in the operation of laboratory, and to generate valid results. Implementation of ISO/IEC 17025:2017 is also related to the implementation of ISO 9001:2015 standard which contains a process-based PDCA cycle (Plan-Do-Check-Act). The PDCA cycle is commonly used in terms of improving quality of services that is in line with the objective of the implementation of ISO/IEC 17025:2017. Therefore, this research discusses the concept of PDCA which is used in ISO 9001:2015 based on ISO/IEC 17025:2017's clause to provide convenience in understanding the implementation of ISO/IEC 17025:2017in the transition period. This research is conducted by reviewing clause by clause on ISO/IEC 17025:2017 standard which is connected with PDCA concept. The result of this research is obtained PDCA model which contains clauses on ISO/IEC 17025:2017 standard accompanied by its implementation in calibration and testing laboratories.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Implementation of PDCA Cycle in Calibration and Testing Laboratory Based on ISO/IEC 17025:2017 | 970KB | download |