Contractor Project Organization Problems on the Implementation of Building Construction at Lhokseumawe City | |
工业技术(总论);自然科学(总论) | |
Hanif^1 | |
Department of Civil Engineering, Politeknik Negeri Lhokseumawe, Aceh, Indonesia^1 | |
关键词: Building construction; Building construction projects; Internal and external factors; Organization structures; Physical environments; Project organization; Project performance; Tools and technologies; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/536/1/012101/pdf DOI : 10.1088/1757-899X/536/1/012101 |
|
来源: IOP | |
![]() |
【 摘 要 】
The efforts to improve manpower quality are the efforts that are done by the contractor to improve its work quality. Improving the manpower quality principally influences of internal and external factors. The objective of this study is to answer the internal factors that influence project team performance quality in organization structure of contractor project at building construction implementation and to determine the variables that are needed to improve contractor enterprise quality. This research used a building construction project which have done in 2017 at Lhokseumawe city, collecting by disseminating Likert questionnaire. Respondents were chosen from contractor elements, those were project managers and field supervisors. This research used descriptive and inferential analysis. The results showed that the overlapping of job descriptions among division in project organization project, the ability to put workers in project, the ability of adaptation in any changes, the tools and machines condition that is used, and the time realization that appropriates to project schedule that is done, are the dominant sub aspects influenced project performance optimization. The influence of organization aspect, workers aspect, physical environment aspect, tools and technology that are used in project aspect, and team performance quality in contractor project organization aspect towards project performance optimization aspect was 69,6%.