会议论文详细信息
11th International Seminar on Industrial Engineering & Management, "Technology and Innovation Challenges Towards Industry 4.0 Era
Waste assessment using lean manufacturing in rubber production
工业技术(总论)
Amrina, Elita^1 ; Putri, Nilda Tri^1 ; Anjani, Dwara Mitha^1
Department of Industrial Engineering, Andalas University, Padang, Indonesia^1
关键词: Failure mode and effect analysis;    Maintenance programs;    Process activities;    Production manager;    Relationship matrix;    Value stream analysis;    Value-added activity;    Waste assessment;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/528/1/012051/pdf
DOI  :  10.1088/1757-899X/528/1/012051
学科分类:工业工程学
来源: IOP
PDF
【 摘 要 】

During the rubber production process, there are several wastes caused by breakdown machines, damaged equipments, and production delays. Those wastes have negative impact to companies and thus, need to be eliminated. This study aims to assess wastes in rubber production process using lean manufacturing approach. Waste Relationship Matrix (WRM), Waste Assessment Questionnaire (WAQ), and Value Stream Analysis Tools (VALSAT) are applied to identify the wastes. Fishbone Diagram is then used to determine the root cause of problems. Finally, Failure Mode and Effect Analysis (FMEA) method is applied to evaluate the source of wastes and develop the action plans. It indicated that over production, inventory, and defects as the three highest wastes in the rubber production. Process Activity Mapping (PAM) is selected as the analysis tools in VALSAT and it obtained the activities in the rubber production are mostly categorized into value added activities. The necessary but non value added activities are also identified at a fairly high frequent. The major risks during the rubber production is related to dynamo damage and machine clogged in both hammer mill and mangle machine. It needs high attention from the production manager of rubber industry. Then, action plans are suggested to improve the maintenance program.

【 预 览 】
附件列表
Files Size Format View
Waste assessment using lean manufacturing in rubber production 880KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:19次