| 2019 3rd International Conference on Manufacturing Technologies | |
| Research on Construction Process of the Cable-net Structure of FAST | |
| 工业技术(总论) | |
| Kong, Xu^1^2^3 ; Wang, Qiming^4 | |
| China Manned Space Agency, Beijing | |
| 100034, China^1 | |
| Manned Space Technology System Center, Beijing | |
| 100094, China^2 | |
| Tsinghua University Department of Industrial Engineering, Beijing | |
| 100084, China^3 | |
| National Astronomical Observatories Chinese Academy of Sciences, Beijing | |
| 100012, China^4 | |
| 关键词: Cable net structures; Construction method; Construction process; Construction program; Five-hundred meter aperture spherical radio telescopes; Mechanical problems; Technical difficulties; Theory construction; | |
| Others : https://iopscience.iop.org/article/10.1088/1757-899X/521/1/012006/pdf DOI : 10.1088/1757-899X/521/1/012006 |
|
| 学科分类:工业工程学 | |
| 来源: IOP | |
PDF
|
|
【 摘 要 】
With a huge collecting area of more than 30 football fields, Five-hundred-meter Aperture Spherical radio Telescope (FAST) is the largest single dish in the world. There are many construction methods of large span cable-net structures some of what is very complicated, so the distribution of internal force of structures is intricate and alternative. According to a variety of mechanical problems and technical difficulties existing in the construction process determine the general construction scheme of the podium, through simulated the construction process, optimize the construction program. The research showed that it had no effect on the structure to consolidate part of the construction steps of theory construction scheme, the actual construction scheme to be used is safe and feasible, and the important conclusion that cable crane and V-zone system are safe is arrived.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Research on Construction Process of the Cable-net Structure of FAST | 614KB |
PDF