1st International Conference on Industrial and Manufacturing Engineering | |
Analysis of Boiler Operation Workload in Salted Fish Small Medium Enterprises (SMEs) | |
工业技术(总论);机械制造 | |
Ginting, Sevistha^1 ; Mei, Putri^1 ; Juliana^1 ; Fitriana, Nur^1 ; Muda, Iskandar^1 | |
Accounting Department, Faculty of Economy and Business, Universitas Sumatera Utara, Medan | |
20155, Indonesia^1 | |
关键词: Boiler operations; Fatigue factors; Incoming energy; Physical conditions; Production outputs; Pulse rate; Small medium enterprise; Working time; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/505/1/012151/pdf DOI : 10.1088/1757-899X/505/1/012151 |
|
学科分类:工业工程学 | |
来源: IOP | |
【 摘 要 】
A person's physical condition at work is crucial to the production output. This can be influenced by operator fatigue factor based on operator's calorie requirement while working, since the amount of energy that comes out is greater than the incoming energy at work. The operators working on fish boiling stations are 2 operators and with 2-3 hours working time per day. Thus, to determine the fatigue factor of the operator is to know the pulse operator to determine the number of calories needed by the operator while working. Then the determination of the classification of workload based on the increase in the maximum pulse due to the burden (cardiovascular load = CVL) in every activity undertaken by the worker needs to be known. It is expected that workers can do their work to the maximum in a long time. The method of Cardiovascular Load (CVL) is a calculation to determine the classification of workload based on the calculation of the working pulse rate difference with the resting pulse compared to the difference between the maximum pulse with resting pulse.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Analysis of Boiler Operation Workload in Salted Fish Small Medium Enterprises (SMEs) | 612KB | download |