Work time measurement analysis with indirectly working measurement method on cement bagging station
工业技术(总论);机械制造
Bakhtiar^1 ; Erliana, Cut Ita^1 ; Dermawan, Wan^1
Department of Industrial Engineering, Universitas Malikussaleh, Indonesia^1
关键词: Cement production;    Economic principle;    Measurement methods;    Principles of Movement Economy;    Production activity;    Production targets;    Standard time;    Work measurement;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/505/1/012141/pdf
DOI  :  10.1088/1757-899X/505/1/012141
学科分类:工业工程学
来源: IOP
PDF
【 摘 要 】

Work measurement is one method that can be used to determine the standard time of a job. PT. Yoga Wibawa Mandiri is a company engaged in cement bagging business, this company in cooperation with PT. Semen Padang. In cement bagging companies it is known that so far there are production targets and unfulfilled customer demand due to the absence of standard time that can be used as a reference in conducting production activities. The purpose of this research is to improve the working system in order to get the standard time at the cement bagging station to reach the production target. Therefore, in this research the draft of proposed working method using Method Time Measurement (MTM) to conform to the economic principles of movement and work time measurement. Based on the result of the measurement of the improvement of working method on 3 operators of cement-bagging stations resulted in decreasing cycle time by 6.28 seconds and the increase of cement production amounted to 155.2 tons/operator. This timing can be used as a reference to meet company targets and customer demand.