| Nawaz, Enscore, Ham (NEH) Algorithm To Minimization Of Makespan In Furniture Company | |
| 工业技术(总论);机械制造 | |
| Rizkya, I.^1 ; Syahputri, K.^1 ; Sari, R.M.^1 ; Siregar, I.^1 ; Tambunan, M.M.^1 ; Anizar^1 ; Tarigan, U.^1 ; Isnaini, N.^1 | |
| Department of Industrial Engineering, Faculty of Engineering, Universitas Sumatera Utara, Indonesia^1 | |
| 关键词: Efficiency index; First come first serve methods; First come first serves; Furniture Company; Furniture industry; Production Scheduling; Scheduling systems; Total processing time; | |
| Others : https://iopscience.iop.org/article/10.1088/1757-899X/505/1/012077/pdf DOI : 10.1088/1757-899X/505/1/012077 |
|
| 学科分类:工业工程学 | |
| 来源: IOP | |
PDF
|
|
【 摘 要 】
This study describes production scheduling to minimize the delay in delivering products to consumers. Production scheduling using Nawaz, Enscore, Ham (NEH) Algorithm is done to minimize the total processing time of the product so that the product is finished on time. The fulfillment of due date affects the process of delivering products to consumers. Production scheduling is done in the furniture industry that runs the First-Come-First-Serve (FCFS) scheduling system. This study also compares the performance of the FCFS scheduling system with NEH Algorithm. FCFS scheduling is the existing scheduling systemthat has been implemented. The results of production scheduling with the NEH algorithm indicate the time required to complete all of orders (makespan) more shorter than the First Come First Serve method. The NEH Algorithm is smaller at 78.61 hours or 5.07% than than company's actual method, the FCFS system. The performance of NEH algorithm also proves that it is better than company's actual method with the efficiency index value of 1.05.