会议论文详细信息
1st International Conference on Industrial and Manufacturing Engineering
Study on Energy Productivity Ratio (EPR) on Pre-Factory Design of Glucose Syrup at Riau Indonesia
工业技术(总论);机械制造
Haryanto, B.^1 ; Harahap, H.^1 ; Tambun, R.^1 ; Hasibuan, R.^1 ; Suherman, P.^1 ; Kelvin^1 ; Haryanto, D.^1 ; Wijaya, J.^1
Department of Chemical Engineering, Engineering Faculty, Universitas Sumatera Utara, Jalan Dr. T. Mansur No. 9, Padang Bulan, Medan, Indonesia^1
关键词: Energy demands;    Energy productivity;    Equal energy;    Factory design;    Input energy;    Output energy;    Processing capacities;    Production process;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/505/1/012073/pdf
DOI  :  10.1088/1757-899X/505/1/012073
学科分类:工业工程学
来源: IOP
PDF
【 摘 要 】

The aim of this investigation is to determine the performance of productivity and feasibility of the operation of glucose syrup plant based on Energy Productivity Ratio (EPR). EPR is expressed as the ratio of output to input energy and by-product. Glucose syrup plant is to process dregs of sago to become glucose product. The procedure starts from collecting data needed as input energy such as: dregs of sago prices, energy demand and the depreciation of the factory. The output energy and its by-product comprise the whole production process such as: glucose syrup price and the remaining product calcium chloride. Calculation the equal energy of glucose syrup is to analyze the value of Energy Productivity Ratio (R) based on processing capacity per year, the value of EPR was 2,19 and 4,47 (EPR > 1), which indicated that the processing dregs of sago to glucose syrup is reasonable to be operated based on the energy productivity.

【 预 览 】
附件列表
Files Size Format View
Study on Energy Productivity Ratio (EPR) on Pre-Factory Design of Glucose Syrup at Riau Indonesia 868KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:34次