会议论文详细信息
2nd International Symposium on Application of Materials Science and Energy Materials | |
The Application of Speedy Drivage System in Daliuta Coal Mine | |
材料科学;能源学 | |
Gao, Dengyun^1 ; Liu, Yingjie^1 ; Luo, Wen^1 | |
Shenhua Shendong Coal Group Production Manage Dept., Shan Xi, China^1 | |
关键词: Application process; Continuous optimization; Excavation process; One-time; Parallel operations; Per capita; Straddle type; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/490/6/062073/pdf DOI : 10.1088/1757-899X/490/6/062073 |
|
学科分类:材料科学(综合) | |
来源: IOP | |
![]() |
【 摘 要 】
In order to solve the problem of continuous tension in production from low driving efficiency of coal mine and excessive mining. Daliuta coal mine put forward the idea of using the rapid drivage system for roadway tunneling innovatively. The system optimized the excavation process and used remote control to alpine bolter miner to cut coal. It used straddle type anchor to support the roof and used belt reloader to carry coal. The parallel operation of digging and supporting and one time forming of top support is realized. Thus, the safety of operation and drivage efficiency are greatly improved. It is effective to relieve the difficulty of the tension of coal mines. It came up a lot of problems in the application process of speedy drivage system. But through continuous optimization and improvement, the advantages of speedy drivage system get better play. Since the speedy drivage system used in Daliuta coal mine, it created world's record of the maximum daily footage of 102m, the maximum monthly footage of 2514m, per capita ergonomics reached 1.33m/capita.【 预 览 】
Files | Size | Format | View |
---|---|---|---|
The Application of Speedy Drivage System in Daliuta Coal Mine | 280KB | ![]() |