会议论文详细信息
2019 4th Asia Conference on Power and Electrical Engineering
Electromagnetic Transient Analysis of 750kV Four-circuit Transmission Line on the Same Tower
能源学;电工学
Lou, Ying^1 ; Zha, Zhipeng^1 ; He, Huiwen^1 ; Li, Zhenqiang^1
China Electric Power Research Institute, Wuhan, China^1
关键词: Electromagnetic transient analysis;    Induced voltages;    Neutral grounding;    Power frequency;    Power frequency overvoltage;    Recovery voltage;    Secondary arc current;    Switching overvoltages;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/486/1/012088/pdf
DOI  :  10.1088/1757-899X/486/1/012088
来源: IOP
PDF
【 摘 要 】

The ATP-EMTP program is used to calculate the power frequency overvoltage, open-phase power frequency resonant overvoltage, induced voltage and current, secondary arc current and recovery voltage, and switching overvoltage of 750kV four-circuit transmission line on the same tower. The study reveals that the configuration of four circuits on the same tower has little influence on the power frequency and switching overvoltage, but greatly influences the secondary arc current and recovery voltage, and induced voltage and current. Therefore, measures like installing high-voltage shunt reactor and neutral grounding reactor and line transposition are required. Also, the induced voltage and current ratings of earthing switch are proposed.

【 预 览 】
附件列表
Files Size Format View
Electromagnetic Transient Analysis of 750kV Four-circuit Transmission Line on the Same Tower 755KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:49次