Improvement the scheduling based on the reducing of the dimensionality of the system | |
土木建筑工程 | |
Dobrosotskikh, M.G.^1 ; Mishchenko, V.Ya.^1 ; Preobrazhenskii, M.A.^2 | |
Department of Technology, Organization of Construction, Examination and Management of the Real Estate, Voronezh State Technical University, 20-letija Oktjabrja, 84, Voronezh | |
394006, Russia^1 | |
Department of Physics, Voronezh State Technical University, 20-letija Oktjabrja, 84, Voronezh | |
394006, Russia^2 | |
关键词: Building sites; Closed systems; Configuration space; Construction projects; Dimensional phase spaces; Graphical representations; Operational management; Production practice; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/481/1/012029/pdf DOI : 10.1088/1757-899X/481/1/012029 |
|
学科分类:土木及结构工程学 | |
来源: IOP | |
【 摘 要 】
In this paper a full set of system parameters "building site + resources" has been determined. Methods of discrete description of the closed system dynamics and dynamics of the open system, interacting with external objects, have been formulated. In the four-dimensional phase-space the step function, quantitatively describing the construction production calendar plan, has been defined. It is shown that the stored resources do not determine the duration of construction project implementation, but rather limit it. On the other hand, the non-stock resources determine the possibility of construction project implementation only, when the upper boarder-line of the construction project duration is fixed. The method of reducing the dimension of the phase space by taking into account the spatial and technological relationships has been formulated. It is shown that the problem of reducing the dimension of the proposed algorithm can significantly extend the class of NP-solvable problem of optimizing scheduling and allow visualization of the algorithm to optimize construction production calendar-plan, enabling a significant expansion of the area of its practical application. The possibilities of the use of orthogonal sections of the graphical representation of construction calendar plan in three-dimensional configuration space in strategic and operational management of building production practice, has been demonstrated.